Project Name: Qantaslink Relocation Works

 

Location: Qantas Jet Base, Mascot

 

Client: AW Edwards

 

Civilcraft were engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services necessary for the operation of aircraft. This project required co-ordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected.

 

    - Construction of floodlight footings and associated duct bank infrastructure

    - Sawcutting and Pavement demolition using excavators and pneumatic hammers

    - Design, Supply & installation of sacrificial sheetpiles with horizontal bracing

    - Supply and installation of a dewatering system with 6 inch pumps, well points,

       sedimentation tank for pits & stormwater pipes

    - Earthworks to subgrade level and disposal of spoil classified as ENM

    - Lay stormwater drainage pipeline and backfill with 20 MPa concrete.

    - Form and pour reinforced concrete stormwater pits

    - Construction of 200m of ACO Powerdrain S300K Grated Drain

    - Construction of 150mm deep 5MPa Lean mix concrete subbase

    - Construction of 300mm deep PCC flex concrete pavement.

    - Joint Sealing works

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 