	<title>Civilcraft Line Marking Case Studies | Road &amp; Surface Marking</title>
	<atom:link href="https://civilcraft.com.au/case_studies/linemarking/feed/" rel="self" type="application/rss+xml" />
	<link>https://civilcraft.com.au/case_studies/linemarking/</link>
	<description></description>
	<lastBuildDate>Thu, 27 Jul 2023 05:54:02 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.3.10</generator>
	<item>
		<title>AW Edwards &#8211; QantasLink Relocation Works</title>
		<link>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/</link>
					<comments>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:00:05 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/aw-edwards-qantaslink-relocation-works/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services. This project required coordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected. Summary of works: Demolition of existing heavy-duty pavement. Earthworks to subgrade level and disposal of spoil classified as excavated natural material (ENM). Design, supply and installation of sacrificial sheet piles with horizontal bracing. Installation of a dewatering system which included with six inch pumps, well points, sedimentation tank for pits and stormwater pipes. Install stormwater infrastructure including stormwater pipes, cast in situ pits and ACO Powerdrain S300K grated drain. Construction of floodlight footings and associated duct bank infrastructure. Construction of heavy-duty pavement consisting of a lean mix concrete subbase layer and a PCC flexural concrete layer. Joint sealing works.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/">AW Edwards &#8211; QantasLink Relocation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services.</p>
<p>This project required coordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Demolition of existing heavy-duty pavement.</li>
<li>Earthworks to subgrade level and disposal of spoil classified as excavated natural material (ENM).</li>
<li>Design, supply and installation of sacrificial sheet piles with horizontal bracing.</li>
<li>Installation of a dewatering system which included with six inch pumps, well points, sedimentation tank for pits and stormwater pipes.</li>
<li>Install stormwater infrastructure including stormwater pipes, cast in situ pits and ACO Powerdrain S300K grated drain.</li>
<li>Construction of floodlight footings and associated duct bank infrastructure.</li>
<li>Construction of heavy-duty pavement consisting of a lean mix concrete subbase layer and a PCC flexural concrete layer.</li>
<li>Joint sealing works.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/">AW Edwards &#8211; QantasLink Relocation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Goodman Property Services c/o TNT – Concrete Hardstand Extension works</title>
		<link>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/</link>
					<comments>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:32:06 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/goodman-tnt-hardstand-extension/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Goodman Property Services to undertake the construction of a new pavement hardstand extension area within an existing live site of one of their current tenants &#8211; TNT Logistics. The new hardstand area would cater for increased storage and logistic requirements. Summary of Works: Relocation/ diversion of existing power and telecommunications services. Removal of landscaping and vegetation. Excavation, demolition and removal of unsuitable material. Construction of lean mix concrete subbase layer. Construction of concrete pavement using High Early Strength 40MPa concrete. Installation of 2.4m high black spear top fencing. Installation of new signs. Pavement linemarking.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/">Goodman Property Services c/o TNT – Concrete Hardstand Extension works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Goodman Property Services to undertake the construction of a new pavement hardstand extension area within an existing live site of one of their current tenants &#8211; TNT Logistics.</p>
<p>The new hardstand area would cater for increased storage and logistic requirements.</p>
<p><strong>Summary of Works:</strong></p>
<ul>
<li>Relocation/ diversion of existing power and telecommunications services.</li>
<li>Removal of landscaping and vegetation.</li>
<li>Excavation, demolition and removal of unsuitable material.</li>
<li>Construction of lean mix concrete subbase layer.</li>
<li>Construction of concrete pavement using High Early Strength 40MPa concrete.</li>
<li>Installation of 2.4m high black spear top fencing.</li>
<li>Installation of new signs.</li>
<li>Pavement linemarking.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/">Goodman Property Services c/o TNT – Concrete Hardstand Extension works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Botany Bay Council &#8211; Pedestrian Safety Upgrade</title>
		<link>https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/</link>
					<comments>https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:07:36 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/botany-bay-council-pedestrian-safety-upgrade/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Botany Bay Council to construct a new pedestrian refuge crossing and a speed hump adjacent to the David Phillips Sports Field along Banks Avenue, Daceyville. Summary of works:  Preparation of traffic control plans (TCPs). Site preparation including locating and isolating existing service. Traffic management. Demolition and excavation of existing concrete median. Construction of new pedestrian refuge. Construction of new concrete kerb and pram ramp. Erection of RTA Type 1 pedestrian fencing. Installation of bicycle hold bars and signs. Landscaping works. Linemarking.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/">Botany Bay Council &#8211; Pedestrian Safety Upgrade</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Botany Bay Council to construct a new pedestrian refuge crossing and a speed hump adjacent to the David Phillips Sports Field along Banks Avenue, Daceyville.</p>
<p><strong>Summary of works: </strong></p>
<ul>
<li>Preparation of traffic control plans (TCPs).</li>
<li>Site preparation including locating and isolating existing service.</li>
<li>Traffic management.</li>
<li>Demolition and excavation of existing concrete median.</li>
<li>Construction of new pedestrian refuge.</li>
<li>Construction of new concrete kerb and pram ramp.</li>
<li>Erection of RTA Type 1 pedestrian fencing.</li>
<li>Installation of bicycle hold bars and signs.</li>
<li>Landscaping works.</li>
<li>Linemarking.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/">Botany Bay Council &#8211; Pedestrian Safety Upgrade</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Roads and Maritime Services &#8211; Bradfield Tunnel Remediation Works</title>
		<link>https://civilcraft.com.au/case-study/rms-bradfield-tunnel-remediation-works/</link>
					<comments>https://civilcraft.com.au/case-study/rms-bradfield-tunnel-remediation-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:00:05 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/rms-bradfield-tunnel-remediation-works/</guid>

					<description><![CDATA[<p>The purpose of this project was to remove asbestos trays, rocks and dumped construction wastes from beneath the Bradfield Tunnel. By removing this waste, it would allow for steel beams to be exposed that would provide a safe working area for future maintenance of the beams. As site access was restricted, Civilcraft developed a methodology to remove waste via a conveyor system. The conveyor would transport the material to a skip bin that would then be taken offsite. Summary of works: Installation of kickboards to avoid any stones or rocks from rolling onto the Cahill Expressway roof structure situation below the work zone. The excavation and removal of approximately 130 tonnes of rubble and construction waste from beneath the Bradfield Highway, adjacent to the steel beams. The safe removal and disposal of the asbestos cable trays (approximate length of 55m) in accordance with “WorkCover Working with Asbestos 2008” Guidelines.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/rms-bradfield-tunnel-remediation-works/">Roads and Maritime Services &#8211; Bradfield Tunnel Remediation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The purpose of this project was to remove asbestos trays, rocks and dumped construction wastes from beneath the Bradfield Tunnel. By removing this waste, it would allow for steel beams to be exposed that would provide a safe working area for future maintenance of the beams.</p>
<p>As site access was restricted, Civilcraft developed a methodology to remove waste via a conveyor system. The conveyor would transport the material to a skip bin that would then be taken offsite.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Installation of kickboards to avoid any stones or rocks from rolling onto the Cahill Expressway roof structure situation below the work zone.</li>
<li>The excavation and removal of approximately 130 tonnes of rubble and construction waste from beneath the Bradfield Highway, adjacent to the steel beams.</li>
<li>The safe removal and disposal of the asbestos cable trays (approximate length of 55m) in accordance with “WorkCover Working with Asbestos 2008” Guidelines.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/rms-bradfield-tunnel-remediation-works/">Roads and Maritime Services &#8211; Bradfield Tunnel Remediation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/rms-bradfield-tunnel-remediation-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>