Project details

  • Bulk earthworks of existing grassed verges:
  • Demolition of existing kerbs, footpaths, pavement and pits:
  • Placement of concrete precast panels over existing services trench:
  • Engagement of a Qantas Certified plumber to carry out some water service adjustments:
  • Installation of new concrete precast pits and grated gully pits to suit new levels:
  • Construction of new concrete kerbs, dish drains, footings and retaining walls:
  • Installation of new compliant landside/airside chainwire fencing:
  • Linemarking works:
  • Relocation of existing gas bottle storage area by constructing new vehicular pavement, installation of airport chainwire fence, new guardrail and linemarking.:
  • Guardrail rectification works:
  • Turfing of disturbed areas:

Qantas Jet Base, Mascot

Project Name: Wide Body Maintenance (Early Works).

 

Location: Qantas Jet Base, Mascot.

 

Client: Qantas Airways Limited.

 

Description: This project was undertaken as part of the Qantas master plan to construct a new hardstand area for the maintenance and washing of Boeing 747 aircraft at the Qantas Jet Base in Mascot. To allow for the wingspans of this aircraft, a nearby roadway and security gates used by catering trucks to access aircraft had to be relocated resulting in the loss of several carpark spaces.

 

As a preferred Qantas Contractor, Civilcraft was awarded this Contract to facilitate the Qantas Staff with additional parking at the Qantas Jet Base.