<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Foundations Case Study 2026 | Civilcraft Australia</title>
	<atom:link href="https://civilcraft.com.au/case_studies/foundations/feed/" rel="self" type="application/rss+xml" />
	<link>https://civilcraft.com.au/case_studies/foundations/</link>
	<description></description>
	<lastBuildDate>Tue, 09 Dec 2025 02:47:28 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.3.10</generator>
	<item>
		<title>Camden Airport &#8211; Aircraft Refueling System</title>
		<link>https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/</link>
					<comments>https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/#respond</comments>
		
		<dc:creator><![CDATA[Theo Theo]]></dc:creator>
		<pubDate>Tue, 09 Dec 2025 02:20:38 +0000</pubDate>
				<guid isPermaLink="false">https://civilcraft.com.au/?post_type=portfolio&#038;p=3408</guid>

					<description><![CDATA[<p>Civilcraft was engaged by MorPro to deliver a new aircraft refuelling facility for tenants at Camden Airport, an airfield supporting aircraft maintenance, flight training, gliding, and recreational and charter operations. The project aimed to provide a purpose-built drive-in facility capable of efficiently servicing the wide variety of aircraft that operate daily from this facility. Scope of works included: Installation of stormwater infrastructure, including precast pits, pipework, and a Enviro OE30 oily water separation system to manage runoff from the refuelling area. Excavation and construction of heavy-duty asphalt pavement, designed to accommodate refuelling vehicles and a wide variety of aircraft movements. Construction of reinforced concrete slabs and edge beams to support the modular fuel storage and dispensing units supplied by IOR. Installation of concrete containment elements, including a flush kerb perimeter around the facility to provide structural definition and manage surface flows. Construction of pavement layers comprising select fill, roadbase, primer seal and asphalt to create a durable apron suitable for aircraft and refuelling vehicles. Reinstatement of new and existing airside linemarking in accordance with CASA regulations and apron layout requirements. Reshaping and stabilisation of perimeter batters, including topsoiling and turfing to restore the surrounding landscape and ensure long-term erosion control. [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/">Camden Airport &#8211; Aircraft Refueling System</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p data-start="175" data-end="562">Civilcraft was engaged by MorPro to deliver a new aircraft refuelling facility for tenants at Camden Airport, an airfield supporting aircraft maintenance, flight training, gliding, and recreational and charter operations. The project aimed to provide a purpose-built drive-in facility capable of efficiently servicing the wide variety of aircraft that operate daily from this facility.</p>
<p>Scope of works included:</p>
<ul>
<li>Installation of stormwater infrastructure, including precast pits, pipework, and a Enviro OE30 oily water separation system to manage runoff from the refuelling area.</li>
<li data-start="535" data-end="688">Excavation and construction of heavy-duty asphalt pavement, designed to accommodate refuelling vehicles and a wide variety of aircraft movements.</li>
<li data-start="689" data-end="827">Construction of reinforced concrete slabs and edge beams to support the modular fuel storage and dispensing units supplied by IOR.</li>
<li data-start="828" data-end="994">Installation of concrete containment elements, including a flush kerb perimeter around the facility to provide structural definition and manage surface flows.</li>
<li data-start="828" data-end="994">Construction of pavement layers comprising select fill, roadbase, primer seal and asphalt to create a durable apron suitable for aircraft and refuelling vehicles.</li>
<li data-start="995" data-end="1123">Reinstatement of new and existing airside linemarking in accordance with CASA regulations and apron layout requirements.</li>
<li data-start="1124" data-end="1289">Reshaping and stabilisation of perimeter batters, including topsoiling and turfing to restore the surrounding landscape and ensure long-term erosion control.</li>
<li data-start="1290" data-end="1446">Specialised crane lifting operations for placement of precast stormwater assets and modular fuel units, executed under strict airside safety control</li>
</ul>
<p>Despite the complexities of working within an operational airport environment, Civilcraft successfully managed all risks and constraints through close coordination with Aeria Management Group, ensuring strict adherence to WHS, environmental, and quality protocols.</p>
<p data-start="1526" data-end="1571">Key challenges and achievements included:</p>
<ul data-start="1573" data-end="1956">
<li data-start="1887" data-end="1956">Managing works within an active airside environment, including close coordination with AMG to maintain safe access around live taxiways, aprons, and the runway.</li>
<li data-start="1887" data-end="1956">Maintaining operational continuity for existing tenants and aviation service providers, including the NSW Rural Fire Service, through staged works and effective communication.</li>
<li data-start="1887" data-end="1956">Overcoming geotechnical issues, notably high groundwater levels that influenced excavation sequencing, dewatering requirements, and foundation preparation.</li>
<li data-start="1887" data-end="1956">Executing high-risk lifting activities for both stormwater infrastructure and the modular fuel facility, requiring precise planning, exclusion zones, and strict WHS oversight.</li>
<li data-start="1887" data-end="1956">Achieving zero lost-time incidents, demonstrating strong adherence to Civilcraft’s Integrated Management System (IMS) and commitment to safety, quality, and environmental performance.</li>
</ul>
<p data-start="1958" data-end="2146">
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/">Camden Airport &#8211; Aircraft Refueling System</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>AW Edwards &#8211; QantasLink Relocation Works</title>
		<link>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/</link>
					<comments>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:00:05 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/aw-edwards-qantaslink-relocation-works/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services. This project required coordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected. Summary of works: Demolition of existing heavy-duty pavement. Earthworks to subgrade level and disposal of spoil classified as excavated natural material (ENM). Design, supply and installation of sacrificial sheet piles with horizontal bracing. Installation of a dewatering system which included with six inch pumps, well points, sedimentation tank for pits and stormwater pipes. Install stormwater infrastructure including stormwater pipes, cast in situ pits and ACO Powerdrain S300K grated drain. Construction of floodlight footings and associated duct bank infrastructure. Construction of heavy-duty pavement consisting of a lean mix concrete subbase layer and a PCC flexural concrete layer. Joint sealing works.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/">AW Edwards &#8211; QantasLink Relocation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services.</p>
<p>This project required coordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Demolition of existing heavy-duty pavement.</li>
<li>Earthworks to subgrade level and disposal of spoil classified as excavated natural material (ENM).</li>
<li>Design, supply and installation of sacrificial sheet piles with horizontal bracing.</li>
<li>Installation of a dewatering system which included with six inch pumps, well points, sedimentation tank for pits and stormwater pipes.</li>
<li>Install stormwater infrastructure including stormwater pipes, cast in situ pits and ACO Powerdrain S300K grated drain.</li>
<li>Construction of floodlight footings and associated duct bank infrastructure.</li>
<li>Construction of heavy-duty pavement consisting of a lean mix concrete subbase layer and a PCC flexural concrete layer.</li>
<li>Joint sealing works.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/">AW Edwards &#8211; QantasLink Relocation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Port Authority of NSW &#8211; Gangway Infrastructure Works</title>
		<link>https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/</link>
					<comments>https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:33:41 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/port-authority-of-nsw-gangway-infrastructure-works/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the construction of gangway infrastructure works at the Overseas Passenger Terminal, Circular Quay to accommodate the arrival of two new rail mounted gangways. Due to significant challenges in cruise capacity and the previous gangway system posing extreme operational and safety risks, the decision was made to significantly upgrade the gangways for the safe movement of passengers between the terminal and port vessels. Civilcraft was selected based on their value for money construction methodology which gave the client confidence we could maintain daily port operations and achieve the tight program set for the arrival of the new gangways. Summary of works: Demolition and removal of the existing seaward rail. Demolition and removal of various existing pavements for new landward beam. Excavation, protection and redirection of existing services. Staged construction of new seaward and landward concrete rail beams. Supply &#38; installation of the new rails and associated hardware, including earthing. Restoring the wharf surfaces on each side of each rail beam.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/">Port Authority of NSW &#8211; Gangway Infrastructure Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the construction of gangway infrastructure works at the Overseas Passenger Terminal, Circular Quay to accommodate the arrival of two new rail mounted gangways.</p>
<p>Due to significant challenges in cruise capacity and the previous gangway system posing extreme operational and safety risks, the decision was made to significantly upgrade the gangways for the safe movement of passengers between the terminal and port vessels.</p>
<p>Civilcraft was selected based on their value for money construction methodology which gave the client confidence we could maintain daily port operations and achieve the tight program set for the arrival of the new gangways.</p>
<p><b>Summary of works:</b></p>
<ul>
<li>Demolition and removal of the existing seaward rail.</li>
<li>Demolition and removal of various existing pavements for new landward beam.</li>
<li>Excavation, protection and redirection of existing services.</li>
<li>Staged construction of new seaward and landward concrete rail beams.</li>
<li>Supply &amp; installation of the new rails and associated hardware, including earthing.</li>
<li>Restoring the wharf surfaces on each side of each rail beam.<b></b></li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/">Port Authority of NSW &#8211; Gangway Infrastructure Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Port Authority of NSW &#8211; OPT Southern Mooring Point Construction</title>
		<link>https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/</link>
					<comments>https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:35:54 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/port-authority-of-nsw-opt-southern-mooring-point/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the mooring point construction of a new mooring point at the southern end of the Overseas Passenger Terminal at Circular Quay. The new mooring point is required for the safe berthing of the next generation of cruise ships including the Ovation of the Seas which arrived in December, 2016. The Ovation of the Seas, with a capacity of 4,905 passengers and weighing in at 170,000 gross tonnes is the largest cruise ship to sail into Sydney. Some of the challenges faced on this project included the high-profile locations, pedestrian management, tight workings space and innovative construction methodologies implemented to satisfy the strict quality requirements imposed by the client. Summary of works: Installation of four 864mm piles to a depth of 21.3m into bedrock. Excavation and construction of a 5.0m x 4.5m x 1.5m (L x W x D) reinforced concrete pile cap. Installation of two 150 tonne bollards. Installation new pedestrian fence. Reconstruction of pedestrian concourse to existing condition.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/">Port Authority of NSW &#8211; OPT Southern Mooring Point Construction</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the mooring point construction of a new mooring point at the southern end of the Overseas Passenger Terminal at Circular Quay. The new mooring point is required for the safe berthing of the next generation of cruise ships including the Ovation of the Seas which arrived in December, 2016. The Ovation of the Seas, with a capacity of 4,905 passengers and weighing in at 170,000 gross tonnes is the largest cruise ship to sail into Sydney. Some of the challenges faced on this project included the high-profile locations, pedestrian management, tight workings space and innovative construction methodologies implemented to satisfy the strict quality requirements imposed by the client.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Installation of four 864mm piles to a depth of 21.3m into bedrock.</li>
<li>Excavation and construction of a 5.0m x 4.5m x 1.5m (L x W x D) reinforced concrete pile cap.</li>
<li>Installation of two 150 tonne bollards.</li>
<li>Installation new pedestrian fence.</li>
<li>Reconstruction of pedestrian concourse to existing condition.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/">Port Authority of NSW &#8211; OPT Southern Mooring Point Construction</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Goodman Property Services c/o TNT – Concrete Hardstand Extension works</title>
		<link>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/</link>
					<comments>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:32:06 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/goodman-tnt-hardstand-extension/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Goodman Property Services to undertake the construction of a new pavement hardstand extension area within an existing live site of one of their current tenants &#8211; TNT Logistics. The new hardstand area would cater for increased storage and logistic requirements. Summary of Works: Relocation/ diversion of existing power and telecommunications services. Removal of landscaping and vegetation. Excavation, demolition and removal of unsuitable material. Construction of lean mix concrete subbase layer. Construction of concrete pavement using High Early Strength 40MPa concrete. Installation of 2.4m high black spear top fencing. Installation of new signs. Pavement linemarking.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/">Goodman Property Services c/o TNT – Concrete Hardstand Extension works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Goodman Property Services to undertake the construction of a new pavement hardstand extension area within an existing live site of one of their current tenants &#8211; TNT Logistics.</p>
<p>The new hardstand area would cater for increased storage and logistic requirements.</p>
<p><strong>Summary of Works:</strong></p>
<ul>
<li>Relocation/ diversion of existing power and telecommunications services.</li>
<li>Removal of landscaping and vegetation.</li>
<li>Excavation, demolition and removal of unsuitable material.</li>
<li>Construction of lean mix concrete subbase layer.</li>
<li>Construction of concrete pavement using High Early Strength 40MPa concrete.</li>
<li>Installation of 2.4m high black spear top fencing.</li>
<li>Installation of new signs.</li>
<li>Pavement linemarking.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/">Goodman Property Services c/o TNT – Concrete Hardstand Extension works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Centennial Parklands &#8211; Duck Pond Retaining Wall Remediation Works</title>
		<link>https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/</link>
					<comments>https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:32:06 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/centennial-parklands-retaining-wall-remediation/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Centennial Parklands and Moore Park Trust to undertake the rectification of the existing sandstone retaining wall structure. Heavy erosion of the pond bed had caused the sandstone blocks on the pond embankment to fail, stressing the necessity for a total rebuild and remediation to eliminate the complete failure of the retaining wall and adjacent pavement. Summary of Works: Design and construct cofferdam and carry out dewatering. Remove and stack existing sandstone pavers and block wall for restoration at a later stage. Cutting of batters. Install reinforcement, weep holes and pour blinding. Prepare all subgrade and new footing works beneath the line of sandstone block wall. Form and pour new footing on gravel bed. Rebuild sandstone wall. Place and compact free draining fill behind new sandstone block wall. Reconstruct wall and backfill progressively to achieve a similar incline of the existing wall. Reinstate pavers to original surface levels and sequencing.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/">Centennial Parklands &#8211; Duck Pond Retaining Wall Remediation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Centennial Parklands and Moore Park Trust to undertake the rectification of the existing sandstone retaining wall structure. Heavy erosion of the pond bed had caused the sandstone blocks on the pond embankment to fail, stressing the necessity for a total rebuild and remediation to eliminate the complete failure of the retaining wall and adjacent pavement.</p>
<p><b>Summary of</b> <strong>Works:</strong></p>
<ul>
<li>Design and construct cofferdam and carry out dewatering.</li>
<li>Remove and stack existing sandstone pavers and block wall for restoration at a later stage.</li>
<li>Cutting of batters.</li>
<li>Install reinforcement, weep holes and pour blinding.</li>
<li>Prepare all subgrade and new footing works beneath the line of sandstone block wall.</li>
<li>Form and pour new footing on gravel bed.</li>
<li>Rebuild sandstone wall.</li>
<li>Place and compact free draining fill behind new sandstone block wall.</li>
<li>Reconstruct wall and backfill progressively to achieve a similar incline of the existing wall.</li>
<li>Reinstate pavers to original surface levels and sequencing.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/">Centennial Parklands &#8211; Duck Pond Retaining Wall Remediation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Botany Bay Council &#8211; Pedestrian Safety Upgrade</title>
		<link>https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/</link>
					<comments>https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:07:36 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/botany-bay-council-pedestrian-safety-upgrade/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Botany Bay Council to construct a new pedestrian refuge crossing and a speed hump adjacent to the David Phillips Sports Field along Banks Avenue, Daceyville. Summary of works:  Preparation of traffic control plans (TCPs). Site preparation including locating and isolating existing service. Traffic management. Demolition and excavation of existing concrete median. Construction of new pedestrian refuge. Construction of new concrete kerb and pram ramp. Erection of RTA Type 1 pedestrian fencing. Installation of bicycle hold bars and signs. Landscaping works. Linemarking.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/">Botany Bay Council &#8211; Pedestrian Safety Upgrade</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Botany Bay Council to construct a new pedestrian refuge crossing and a speed hump adjacent to the David Phillips Sports Field along Banks Avenue, Daceyville.</p>
<p><strong>Summary of works: </strong></p>
<ul>
<li>Preparation of traffic control plans (TCPs).</li>
<li>Site preparation including locating and isolating existing service.</li>
<li>Traffic management.</li>
<li>Demolition and excavation of existing concrete median.</li>
<li>Construction of new pedestrian refuge.</li>
<li>Construction of new concrete kerb and pram ramp.</li>
<li>Erection of RTA Type 1 pedestrian fencing.</li>
<li>Installation of bicycle hold bars and signs.</li>
<li>Landscaping works.</li>
<li>Linemarking.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/">Botany Bay Council &#8211; Pedestrian Safety Upgrade</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/botany-bay-council-pedestrian-safety-upgrade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
