<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Bulk and detailed earthworks Archives - Civilcraft</title>
	<atom:link href="https://civilcraft.com.au/case_studies/bulk-and-detailed-earthworks/feed/" rel="self" type="application/rss+xml" />
	<link>https://civilcraft.com.au/case_studies/bulk-and-detailed-earthworks/</link>
	<description></description>
	<lastBuildDate>Tue, 09 Dec 2025 02:47:28 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.3.10</generator>
	<item>
		<title>Camden Airport &#8211; Aircraft Refueling System</title>
		<link>https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/</link>
					<comments>https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/#respond</comments>
		
		<dc:creator><![CDATA[Theo Theo]]></dc:creator>
		<pubDate>Tue, 09 Dec 2025 02:20:38 +0000</pubDate>
				<guid isPermaLink="false">https://civilcraft.com.au/?post_type=portfolio&#038;p=3408</guid>

					<description><![CDATA[<p>Civilcraft was engaged by MorPro to deliver a new aircraft refuelling facility for tenants at Camden Airport, an airfield supporting aircraft maintenance, flight training, gliding, and recreational and charter operations. The project aimed to provide a purpose-built drive-in facility capable of efficiently servicing the wide variety of aircraft that operate daily from this facility. Scope of works included: Installation of stormwater infrastructure, including precast pits, pipework, and a Enviro OE30 oily water separation system to manage runoff from the refuelling area. Excavation and construction of heavy-duty asphalt pavement, designed to accommodate refuelling vehicles and a wide variety of aircraft movements. Construction of reinforced concrete slabs and edge beams to support the modular fuel storage and dispensing units supplied by IOR. Installation of concrete containment elements, including a flush kerb perimeter around the facility to provide structural definition and manage surface flows. Construction of pavement layers comprising select fill, roadbase, primer seal and asphalt to create a durable apron suitable for aircraft and refuelling vehicles. Reinstatement of new and existing airside linemarking in accordance with CASA regulations and apron layout requirements. Reshaping and stabilisation of perimeter batters, including topsoiling and turfing to restore the surrounding landscape and ensure long-term erosion control. [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/">Camden Airport &#8211; Aircraft Refueling System</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p data-start="175" data-end="562">Civilcraft was engaged by MorPro to deliver a new aircraft refuelling facility for tenants at Camden Airport, an airfield supporting aircraft maintenance, flight training, gliding, and recreational and charter operations. The project aimed to provide a purpose-built drive-in facility capable of efficiently servicing the wide variety of aircraft that operate daily from this facility.</p>
<p>Scope of works included:</p>
<ul>
<li>Installation of stormwater infrastructure, including precast pits, pipework, and a Enviro OE30 oily water separation system to manage runoff from the refuelling area.</li>
<li data-start="535" data-end="688">Excavation and construction of heavy-duty asphalt pavement, designed to accommodate refuelling vehicles and a wide variety of aircraft movements.</li>
<li data-start="689" data-end="827">Construction of reinforced concrete slabs and edge beams to support the modular fuel storage and dispensing units supplied by IOR.</li>
<li data-start="828" data-end="994">Installation of concrete containment elements, including a flush kerb perimeter around the facility to provide structural definition and manage surface flows.</li>
<li data-start="828" data-end="994">Construction of pavement layers comprising select fill, roadbase, primer seal and asphalt to create a durable apron suitable for aircraft and refuelling vehicles.</li>
<li data-start="995" data-end="1123">Reinstatement of new and existing airside linemarking in accordance with CASA regulations and apron layout requirements.</li>
<li data-start="1124" data-end="1289">Reshaping and stabilisation of perimeter batters, including topsoiling and turfing to restore the surrounding landscape and ensure long-term erosion control.</li>
<li data-start="1290" data-end="1446">Specialised crane lifting operations for placement of precast stormwater assets and modular fuel units, executed under strict airside safety control</li>
</ul>
<p>Despite the complexities of working within an operational airport environment, Civilcraft successfully managed all risks and constraints through close coordination with Aeria Management Group, ensuring strict adherence to WHS, environmental, and quality protocols.</p>
<p data-start="1526" data-end="1571">Key challenges and achievements included:</p>
<ul data-start="1573" data-end="1956">
<li data-start="1887" data-end="1956">Managing works within an active airside environment, including close coordination with AMG to maintain safe access around live taxiways, aprons, and the runway.</li>
<li data-start="1887" data-end="1956">Maintaining operational continuity for existing tenants and aviation service providers, including the NSW Rural Fire Service, through staged works and effective communication.</li>
<li data-start="1887" data-end="1956">Overcoming geotechnical issues, notably high groundwater levels that influenced excavation sequencing, dewatering requirements, and foundation preparation.</li>
<li data-start="1887" data-end="1956">Executing high-risk lifting activities for both stormwater infrastructure and the modular fuel facility, requiring precise planning, exclusion zones, and strict WHS oversight.</li>
<li data-start="1887" data-end="1956">Achieving zero lost-time incidents, demonstrating strong adherence to Civilcraft’s Integrated Management System (IMS) and commitment to safety, quality, and environmental performance.</li>
</ul>
<p data-start="1958" data-end="2146">
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/">Camden Airport &#8211; Aircraft Refueling System</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/camden-airport-aircraft-refueling-system/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Qantas Airways Limited – DNATA Carpark Upgrade Works</title>
		<link>https://civilcraft.com.au/case-study/qantas-airways-limited-dnata-carpark-upgrade-works/</link>
					<comments>https://civilcraft.com.au/case-study/qantas-airways-limited-dnata-carpark-upgrade-works/#respond</comments>
		
		<dc:creator><![CDATA[Theo Theo]]></dc:creator>
		<pubDate>Thu, 04 Dec 2025 23:10:50 +0000</pubDate>
				<guid isPermaLink="false">https://civilcraft.com.au/?post_type=portfolio&#038;p=3398</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Qantas Airways Limited to deliver the staged upgrade of the DNATA carpark located at Kent Road, Mascot. The project aimed to rejuvenate the existing asphalt pavement, improve traffic flow and pedestrian safety, and enhance the overall functionality of the DNATA carpark servicing Qantas catering operations. The works were undertaken in six stages to ensure uninterrupted access and continuity of operations for Qantas and DNATA staff. Stages 1 and 2 formed the initial phase, focusing on the most critical and high-traffic sections of the facility. These stages involved resurfacing, repainting, and the installation of new safety features in accordance with Qantas property standards and airport operational requirements. Stages 3 to 6 was the construction of a new road as the previous access to the upper campus would no longer be accessible and a new entry via Kent Road was built as part of this upgrade. The project was successfully completed under Civilcraft’s Integrated Management System (IMS), achieving all safety, quality, and environmental objectives without any incidents. This work included the following: Site establishment and implementation of delineation devices and temporary traffic management. Milling and re-sheeting of the existing asphaltic concrete pavement with AC10 Wearing Course. Design and [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/qantas-airways-limited-dnata-carpark-upgrade-works/">Qantas Airways Limited – DNATA Carpark Upgrade Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Qantas Airways Limited to deliver the staged upgrade of the DNATA carpark located at Kent Road, Mascot. The project aimed to rejuvenate the existing asphalt pavement, improve traffic flow and pedestrian safety, and enhance the overall functionality of the DNATA carpark servicing Qantas catering operations.</p>
<p>The works were undertaken in six stages to ensure uninterrupted access and continuity of operations for Qantas and DNATA staff. Stages 1 and 2 formed the initial phase, focusing on the most critical and high-traffic sections of the facility. These stages involved resurfacing, repainting, and the installation of new safety features in accordance with Qantas property standards and airport operational requirements. Stages 3 to 6 was the construction of a new road as the previous access to the upper campus would no longer be accessible and a new entry via Kent Road was built as part of this upgrade.</p>
<p>The project was successfully completed under Civilcraft’s Integrated Management System (IMS), achieving all safety, quality, and environmental objectives without any incidents.</p>
<p>This work included the following:</p>
<ul>
<li>Site establishment and implementation of delineation devices and temporary traffic management.</li>
<li>Milling and re-sheeting of the existing asphaltic concrete pavement with AC10 Wearing Course.</li>
<li>Design and construction of new road pavement, kerbs, footpaths and retaining wall.</li>
<li>New drainage lines, pits and upgrades to the existing GPT units.</li>
<li>Repainting of block walls and concrete columns for improved visibility and presentation.</li>
<li>Reinstatement of line marking and numbering throughout each completed zone.</li>
<li>Installation of new bollards, wheel stops, and speed humps for traffic safety.</li>
<li>Instalation of new boom and access control systems inclusive of CCTV Cameras.</li>
<li>Installation of streetscape furniture and custom built bus encolosed bus shelters.</li>
<li>Environmental controls, dust suppression, and disposal of milled material to licensed facilities.</li>
</ul>
<p>Despite the challenges of delivering works within an operational airport environment, Civilcraft successfully managed risks and constraints through careful staging, close coordination with Qantas, and strong adherence to WHS and quality protocols.</p>
<p>Civilcraft successfully navigated several key challenges and risks:</p>
<ul>
<li>Managing night works to comply with lighting, noise, and access restrictions.</li>
<li>Maintaining continuous vehicle and pedestrian access for Qantas Buses on the main alignment and DNATA operations.</li>
<li>Coordinating with multiple stakeholders including Qantas Property, DNATA, and airport security.</li>
<li>Implementing strict WHS and fatigue management systems under the Qantas Site Management Plan.</li>
<li>Achieving zero lost-time incidents across all stages of delivery.</li>
</ul>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/qantas-airways-limited-dnata-carpark-upgrade-works/">Qantas Airways Limited – DNATA Carpark Upgrade Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/qantas-airways-limited-dnata-carpark-upgrade-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>AW Edwards &#8211; QantasLink Relocation Works</title>
		<link>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/</link>
					<comments>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:00:05 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/aw-edwards-qantaslink-relocation-works/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services. This project required coordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected. Summary of works: Demolition of existing heavy-duty pavement. Earthworks to subgrade level and disposal of spoil classified as excavated natural material (ENM). Design, supply and installation of sacrificial sheet piles with horizontal bracing. Installation of a dewatering system which included with six inch pumps, well points, sedimentation tank for pits and stormwater pipes. Install stormwater infrastructure including stormwater pipes, cast in situ pits and ACO Powerdrain S300K grated drain. Construction of floodlight footings and associated duct bank infrastructure. Construction of heavy-duty pavement consisting of a lean mix concrete subbase layer and a PCC flexural concrete layer. Joint sealing works.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/">AW Edwards &#8211; QantasLink Relocation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by AW Edwards to undertake civil works related to the relocation of the existing QantasLink operations from Terminal 2 to Buildings 167 and 171 within the Qantas Jet Base north of Terminal 3. The relocation works required the installation of a fuel spill drainage system for aircraft refuelling services.</p>
<p>This project required coordination with Qantas and Sydney Airport Corporation Limited (SACL) to ensure the existing operations at Terminal 3 and the Qantas Jet Base remained unaffected.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Demolition of existing heavy-duty pavement.</li>
<li>Earthworks to subgrade level and disposal of spoil classified as excavated natural material (ENM).</li>
<li>Design, supply and installation of sacrificial sheet piles with horizontal bracing.</li>
<li>Installation of a dewatering system which included with six inch pumps, well points, sedimentation tank for pits and stormwater pipes.</li>
<li>Install stormwater infrastructure including stormwater pipes, cast in situ pits and ACO Powerdrain S300K grated drain.</li>
<li>Construction of floodlight footings and associated duct bank infrastructure.</li>
<li>Construction of heavy-duty pavement consisting of a lean mix concrete subbase layer and a PCC flexural concrete layer.</li>
<li>Joint sealing works.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/">AW Edwards &#8211; QantasLink Relocation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/aw-edwards-qantaslink-relocation-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Rike Electrical &#8211; Electrical Infrastructure Upgrade</title>
		<link>https://civilcraft.com.au/case-study/rike-electrical-electrical-infrastructure-upgrade/</link>
					<comments>https://civilcraft.com.au/case-study/rike-electrical-electrical-infrastructure-upgrade/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:29:16 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/rike-electrical-electrical-infrastructure-upgrade/</guid>

					<description><![CDATA[<p>Sydney Airport Corporation Limited (SACL) proposed to develop a site located in Ross Smith Avenue for a new KFC restaurant, Café and car wash facility, requiring electrical infrastructure upgrade. Due to the additional electrical load demand from the new development and the limited capacity available from the existing infrastructure, it was proposed to replace the existing ABB 750 kVA kiosk substation with a new 1500 kVA kiosk substation. Civilcraft was engaged to carry out the related civil works including construction of sand pits, excavation of trenches, installation of conduits and pre-cast pits. Summary of works: Service identification. Clearing and grubbing of vegetation. Trench excavation works. Installation of conduits and pits. Backfilling and compaction of trenches. Reinstatement of concrete driveways.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/rike-electrical-electrical-infrastructure-upgrade/">Rike Electrical &#8211; Electrical Infrastructure Upgrade</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Sydney Airport Corporation Limited (SACL) proposed to develop a site located in Ross Smith Avenue for a new KFC restaurant, Café and car wash facility, requiring electrical infrastructure upgrade. Due to the additional electrical load demand from the new development and the limited capacity available from the existing infrastructure, it was proposed to replace the existing ABB 750 kVA kiosk substation with a new 1500 kVA kiosk substation. Civilcraft was engaged to carry out the related civil works including construction of sand pits, excavation of trenches, installation of conduits and pre-cast pits.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Service identification.</li>
<li>Clearing and grubbing of vegetation.</li>
<li>Trench excavation works.</li>
<li>Installation of conduits and pits.</li>
<li>Backfilling and compaction of trenches.</li>
<li>Reinstatement of concrete driveways.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/rike-electrical-electrical-infrastructure-upgrade/">Rike Electrical &#8211; Electrical Infrastructure Upgrade</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/rike-electrical-electrical-infrastructure-upgrade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Port Authority of NSW &#8211; Gangway Infrastructure Works</title>
		<link>https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/</link>
					<comments>https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:33:41 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/port-authority-of-nsw-gangway-infrastructure-works/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the construction of gangway infrastructure works at the Overseas Passenger Terminal, Circular Quay to accommodate the arrival of two new rail mounted gangways. Due to significant challenges in cruise capacity and the previous gangway system posing extreme operational and safety risks, the decision was made to significantly upgrade the gangways for the safe movement of passengers between the terminal and port vessels. Civilcraft was selected based on their value for money construction methodology which gave the client confidence we could maintain daily port operations and achieve the tight program set for the arrival of the new gangways. Summary of works: Demolition and removal of the existing seaward rail. Demolition and removal of various existing pavements for new landward beam. Excavation, protection and redirection of existing services. Staged construction of new seaward and landward concrete rail beams. Supply &#38; installation of the new rails and associated hardware, including earthing. Restoring the wharf surfaces on each side of each rail beam.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/">Port Authority of NSW &#8211; Gangway Infrastructure Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the construction of gangway infrastructure works at the Overseas Passenger Terminal, Circular Quay to accommodate the arrival of two new rail mounted gangways.</p>
<p>Due to significant challenges in cruise capacity and the previous gangway system posing extreme operational and safety risks, the decision was made to significantly upgrade the gangways for the safe movement of passengers between the terminal and port vessels.</p>
<p>Civilcraft was selected based on their value for money construction methodology which gave the client confidence we could maintain daily port operations and achieve the tight program set for the arrival of the new gangways.</p>
<p><b>Summary of works:</b></p>
<ul>
<li>Demolition and removal of the existing seaward rail.</li>
<li>Demolition and removal of various existing pavements for new landward beam.</li>
<li>Excavation, protection and redirection of existing services.</li>
<li>Staged construction of new seaward and landward concrete rail beams.</li>
<li>Supply &amp; installation of the new rails and associated hardware, including earthing.</li>
<li>Restoring the wharf surfaces on each side of each rail beam.<b></b></li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/">Port Authority of NSW &#8211; Gangway Infrastructure Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/port-authority-of-nsw-gangway-infrastructure-works/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Port Authority of NSW &#8211; OPT Southern Mooring Point Construction</title>
		<link>https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/</link>
					<comments>https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:35:54 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/port-authority-of-nsw-opt-southern-mooring-point/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the mooring point construction of a new mooring point at the southern end of the Overseas Passenger Terminal at Circular Quay. The new mooring point is required for the safe berthing of the next generation of cruise ships including the Ovation of the Seas which arrived in December, 2016. The Ovation of the Seas, with a capacity of 4,905 passengers and weighing in at 170,000 gross tonnes is the largest cruise ship to sail into Sydney. Some of the challenges faced on this project included the high-profile locations, pedestrian management, tight workings space and innovative construction methodologies implemented to satisfy the strict quality requirements imposed by the client. Summary of works: Installation of four 864mm piles to a depth of 21.3m into bedrock. Excavation and construction of a 5.0m x 4.5m x 1.5m (L x W x D) reinforced concrete pile cap. Installation of two 150 tonne bollards. Installation new pedestrian fence. Reconstruction of pedestrian concourse to existing condition.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/">Port Authority of NSW &#8211; OPT Southern Mooring Point Construction</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by the Port Authority of NSW to undertake the mooring point construction of a new mooring point at the southern end of the Overseas Passenger Terminal at Circular Quay. The new mooring point is required for the safe berthing of the next generation of cruise ships including the Ovation of the Seas which arrived in December, 2016. The Ovation of the Seas, with a capacity of 4,905 passengers and weighing in at 170,000 gross tonnes is the largest cruise ship to sail into Sydney. Some of the challenges faced on this project included the high-profile locations, pedestrian management, tight workings space and innovative construction methodologies implemented to satisfy the strict quality requirements imposed by the client.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Installation of four 864mm piles to a depth of 21.3m into bedrock.</li>
<li>Excavation and construction of a 5.0m x 4.5m x 1.5m (L x W x D) reinforced concrete pile cap.</li>
<li>Installation of two 150 tonne bollards.</li>
<li>Installation new pedestrian fence.</li>
<li>Reconstruction of pedestrian concourse to existing condition.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/">Port Authority of NSW &#8211; OPT Southern Mooring Point Construction</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/port-authority-of-nsw-opt-southern-mooring-point-construction/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Goodman Property Services c/o TNT – Concrete Hardstand Extension works</title>
		<link>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/</link>
					<comments>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:32:06 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/goodman-tnt-hardstand-extension/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Goodman Property Services to undertake the construction of a new pavement hardstand extension area within an existing live site of one of their current tenants &#8211; TNT Logistics. The new hardstand area would cater for increased storage and logistic requirements. Summary of Works: Relocation/ diversion of existing power and telecommunications services. Removal of landscaping and vegetation. Excavation, demolition and removal of unsuitable material. Construction of lean mix concrete subbase layer. Construction of concrete pavement using High Early Strength 40MPa concrete. Installation of 2.4m high black spear top fencing. Installation of new signs. Pavement linemarking.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/">Goodman Property Services c/o TNT – Concrete Hardstand Extension works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Goodman Property Services to undertake the construction of a new pavement hardstand extension area within an existing live site of one of their current tenants &#8211; TNT Logistics.</p>
<p>The new hardstand area would cater for increased storage and logistic requirements.</p>
<p><strong>Summary of Works:</strong></p>
<ul>
<li>Relocation/ diversion of existing power and telecommunications services.</li>
<li>Removal of landscaping and vegetation.</li>
<li>Excavation, demolition and removal of unsuitable material.</li>
<li>Construction of lean mix concrete subbase layer.</li>
<li>Construction of concrete pavement using High Early Strength 40MPa concrete.</li>
<li>Installation of 2.4m high black spear top fencing.</li>
<li>Installation of new signs.</li>
<li>Pavement linemarking.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/">Goodman Property Services c/o TNT – Concrete Hardstand Extension works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/goodman-tnt-hardstand-extension/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Centennial Parklands &#8211; Duck Pond Retaining Wall Remediation Works</title>
		<link>https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/</link>
					<comments>https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:32:06 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/centennial-parklands-retaining-wall-remediation/</guid>

					<description><![CDATA[<p>Civilcraft was engaged by Centennial Parklands and Moore Park Trust to undertake the rectification of the existing sandstone retaining wall structure. Heavy erosion of the pond bed had caused the sandstone blocks on the pond embankment to fail, stressing the necessity for a total rebuild and remediation to eliminate the complete failure of the retaining wall and adjacent pavement. Summary of Works: Design and construct cofferdam and carry out dewatering. Remove and stack existing sandstone pavers and block wall for restoration at a later stage. Cutting of batters. Install reinforcement, weep holes and pour blinding. Prepare all subgrade and new footing works beneath the line of sandstone block wall. Form and pour new footing on gravel bed. Rebuild sandstone wall. Place and compact free draining fill behind new sandstone block wall. Reconstruct wall and backfill progressively to achieve a similar incline of the existing wall. Reinstate pavers to original surface levels and sequencing.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/">Centennial Parklands &#8211; Duck Pond Retaining Wall Remediation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was engaged by Centennial Parklands and Moore Park Trust to undertake the rectification of the existing sandstone retaining wall structure. Heavy erosion of the pond bed had caused the sandstone blocks on the pond embankment to fail, stressing the necessity for a total rebuild and remediation to eliminate the complete failure of the retaining wall and adjacent pavement.</p>
<p><b>Summary of</b> <strong>Works:</strong></p>
<ul>
<li>Design and construct cofferdam and carry out dewatering.</li>
<li>Remove and stack existing sandstone pavers and block wall for restoration at a later stage.</li>
<li>Cutting of batters.</li>
<li>Install reinforcement, weep holes and pour blinding.</li>
<li>Prepare all subgrade and new footing works beneath the line of sandstone block wall.</li>
<li>Form and pour new footing on gravel bed.</li>
<li>Rebuild sandstone wall.</li>
<li>Place and compact free draining fill behind new sandstone block wall.</li>
<li>Reconstruct wall and backfill progressively to achieve a similar incline of the existing wall.</li>
<li>Reinstate pavers to original surface levels and sequencing.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/">Centennial Parklands &#8211; Duck Pond Retaining Wall Remediation Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/centennial-parklands-retaining-wall-remediation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Botanical Gardens and Centennial Parklands Mount Annan &#8211; Road and drainage infrastructure upgrade works</title>
		<link>https://civilcraft.com.au/case-study/mt-annan-reconstruction-of-road-and-drainage/</link>
					<comments>https://civilcraft.com.au/case-study/mt-annan-reconstruction-of-road-and-drainage/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Fri, 07 Oct 2022 00:38:24 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/portfolio-item/mt-annan-reconstruction-of-road-drainage/</guid>

					<description><![CDATA[<p>Civilcraft was selected to complete the reconstruction of road and drainage of failed pavement and associated drainage works within the Botanical Gardens. Summary of works: Site establishment, installation and maintaining of traffic control during the works. Installation of subsoil drainage within aggregate and bidum behind existing kerb and gutter structure with flush points. Reconstruction of new flexible pavement adjacent to kerb and gutter which consisted of two layers of asphalt on a subbase pavement. Associated work included reconstruction of new driveways, installation of traffic calming devices, signs and linemarking works.</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/mt-annan-reconstruction-of-road-and-drainage/">Botanical Gardens and Centennial Parklands Mount Annan &#8211; Road and drainage infrastructure upgrade works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Civilcraft was selected to complete the reconstruction of road and drainage of failed pavement and associated drainage works within the Botanical Gardens.</p>
<p><strong>Summary of works:</strong></p>
<ul>
<li>Site establishment, installation and maintaining of traffic control during the works.</li>
<li>Installation of subsoil drainage within aggregate and bidum behind existing kerb and gutter structure with flush points.</li>
<li>Reconstruction of new flexible pavement adjacent to kerb and gutter which consisted of two layers of asphalt on a subbase pavement.</li>
<li>Associated work included reconstruction of new driveways, installation of traffic calming devices, signs and linemarking works.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/mt-annan-reconstruction-of-road-and-drainage/">Botanical Gardens and Centennial Parklands Mount Annan &#8211; Road and drainage infrastructure upgrade works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://civilcraft.com.au/case-study/mt-annan-reconstruction-of-road-and-drainage/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>RTH Design &#038; Construction &#8211; Blaxland Road, Denistone Civil Works</title>
		<link>https://civilcraft.com.au/case-study/blaxland-road-denistone-civil-works/</link>
					<comments>https://civilcraft.com.au/case-study/blaxland-road-denistone-civil-works/#respond</comments>
		
		<dc:creator><![CDATA[kooka]]></dc:creator>
		<pubDate>Mon, 17 Apr 2023 06:59:53 +0000</pubDate>
				<guid isPermaLink="false">http://civilcraft.com.au/?post_type=portfolio&#038;p=2430</guid>

					<description><![CDATA[<p>Project Overview: Civilcraft was engaged by RTH Design &#38; Construction to undertake the RMS Minor Works Agreement (WAD) for their property development at 135 Blaxland Road, Denistone. The development of the site with 7 new townhouses necessitated the upgrading of the street frontage including driveways and footpaths to Ryde City Council standards and roadworks to RMS standards. Civilcraft was selected based on their status as an RMS Prequalified Contractor which gave the client confidence we could construct the works to the demanding RMS Specifications and not impact traffic operations on the RMS controlled roadway. Project Components: Obtain RMS &#38; Ryde City Council Approvals. Implement and maintain traffic and pedestrian management including ROL’s. Demolition of existing footpaths, driveways, kerbs &#38; gutters and stormwater pit. Construction of a new grated inlet pit over the existing stormwater line. Construction of new kerb &#38; gutter and vehicle crossing. Construction of new driveways and footpaths. Asphalt resurfacing of the kerb side lane &#38; reinstatement of linemarking. Key Challenges and Risks: Working in a live traffic environment while maintaining traffic and pedestrian movements. Restricted working hours to satisfy permitted lane closures of clearway. Protection of existing RMS assets to be retained. Extensive in-ground and overhead services [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/blaxland-road-denistone-civil-works/">RTH Design &#038; Construction &#8211; Blaxland Road, Denistone Civil Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Project Overview:</strong> Civilcraft was engaged by RTH Design &amp; Construction to undertake the RMS Minor Works Agreement (WAD) for their property development at 135 Blaxland Road, Denistone. The development of the site with 7 new townhouses necessitated the upgrading of the street frontage including driveways and footpaths to Ryde City Council standards and roadworks to RMS standards.</p>
<p>Civilcraft was selected based on their status as an RMS Prequalified Contractor which gave the client confidence we could construct the works to the demanding RMS Specifications and not impact traffic operations on the RMS controlled roadway.</p>
<p><strong>Project Components: </strong></p>
<ul>
<li>Obtain RMS &amp; Ryde City Council Approvals.</li>
<li>Implement and maintain traffic and pedestrian management including ROL’s.</li>
<li>Demolition of existing footpaths, driveways, kerbs &amp; gutters and stormwater pit.</li>
<li>Construction of a new grated inlet pit over the existing stormwater line.</li>
<li>Construction of new kerb &amp; gutter and vehicle crossing.</li>
<li>Construction of new driveways and footpaths.</li>
<li>Asphalt resurfacing of the kerb side lane &amp; reinstatement of linemarking.</li>
</ul>
<p><strong>Key Challenges and Risks: </strong></p>
<ul>
<li>Working in a live traffic environment while maintaining traffic and pedestrian movements.</li>
<li>Restricted working hours to satisfy permitted lane closures of clearway.</li>
<li>Protection of existing RMS assets to be retained.</li>
<li>Extensive in-ground and overhead services within the works area.</li>
</ul>
<p>The post <a rel="nofollow" href="https://civilcraft.com.au/case-study/blaxland-road-denistone-civil-works/">RTH Design &#038; Construction &#8211; Blaxland Road, Denistone Civil Works</a> appeared first on <a rel="nofollow" href="https://civilcraft.com.au">Civilcraft</a>.</p>