Ports

DP World – Port Botany Terminal Container Pad Construction

Project Overview: At DP World Port Botany Terminal, the landing strips for the containers were previously constructed with asphalt and paver blocks. Due to wear and tear, the landing strips were badly damaged and had craters in them. Civilcraft was contracted by DP World to remove asphalt/pavers and construct new landing strips with high strength concrete for longer durability and re-patch any damaged asphalts between the strips.

Project Components:

  • Demolition and excavation of existing asphalt/paver landing strips
  • Subgrade layer preparation
  • Construction of 23m long by 3m wide high early strength concrete pads
  • Re-sheeting damaged asphalt bays in between the strips
  • Linemarking for the grids
  • Client Port Botany Terminal
  • Location Overseas Passenger Terminal, Circular Quay

RELATED CASE STUDIES

OUR CLIENTS

By truly collaborating with our clients, we have developed long term relationships with some of Australia’s leading property owners, developers, managers and government organisations.
SUBSCRIBE TO OUR NEWSLETTER