Blog

Aug 08

Comprehensive reporting for future forecasting

Civilcraft was engaged by Greater Sydney Parklands to produce an initial report detailing the current condition and proposed repair methodology of the existing pits and lintels at Callan Park, Lilyfield. The proposed repairs consisted of Lintel, steel grate and concrete apron replacements, Kerb and grate repairs, and Concrete frame and... read more →
Aug 03
Jul 29
Jul 27
Jul 20

Boardwalk Construction In The Centennial Parklands

Introduction Centennial Parklands is one of Sydney's most valued public green spaces, requiring infrastructure that balances public accessibility with long-term environmental protection. Civilcraft Australia successfully delivered the Lachlan Swamp Boardwalk Upgrade by replacing ageing infrastructure with a durable Fibre-Reinforced Plastic (FRP) boardwalk designed to improve visitor safety, minimise environmental impact,... read more →
Jul 01

Update from ES Marks Athletics Track

Ending the week with an update from ES Marks Athletics Track. Our team have been busy over the past 2 months constructing a highly complex retaining wall for Centennial Parklands as part of a safety upgrade project. The wall has been carefully constructed with curves, steps and varying heights up... read more →
SUBSCRIBE TO OUR NEWSLETTER