Isaac Property Group – Water Street Pavement reconstruction and drainage infrastructure works
Civilcraft was engaged to complete a road reconstruction including a new roadway, drainage, vehicular crossing and sedimentation control on Water Street Werrington. These works form part of the construction of a 7 Eleven and Bridgestone Service Centre.
This project involved a high level of coordination and staging of the works to minimise disruptions to traffic and the local residents.
Summary of works:
- Demolition, excavation and disposal of concrete structures.
- Excavation to allow for the construction of stormwater infrastructure and new kerb and guttering.
- Installation of 375mm diameter reinforced concrete pipes and precast concrete pits and backfilling of pipes.
- Installation of subsoil drainage line.
- Construction of kerb and gutter structure inclusive of kerb inlet pits.
- Mill and re-sheet of existing flexible pavement with tie in to new kerb infrastructure.
- Client Isaac Property Group
- Location Werrington, NSW